<% lang = "eng" title = "Technical Construction File" section = "metrologia" extra = "add" pag = "tcf" function MakeContent() %>

<%= title %>

When it's not possible to make a part of the measurements in a conforming way, we must draft the Technical Construction File.

After having done the necessary tests, provided the bonds due to the nature of the testing device, we proceed to drafting the TCF asking for the intervention of a Competent Organization that, working with neutrality, analyzes the documentation concerning the technical features and the activity done on the EUT (Equipment Under Test), then it recognizes its conformity or not and authorizes the CE mark.

Thanks to two mobile units and to the coordination of a lab equipped with anechoic chamber, TEK-UP supports the manufacturer during the process of calibration: it suggests the appropriate solutions and project techniques, then it drafts measure technical reports and, if necessary, the Technical Construction File.

The measuring environment is Full Compliance to the CISPR 16-1 and wide enough to virtually host any kind of device(mt. 8,00 x 4,43 x 4,00). Matched with full compliance test instrumentation, it allows to execute ELECTROMAGNETICAL COMPATIBILITY (EMISSION AND IMMUNITY) and ELECTRIC SAFETY tests.
<% end function MakeTemplate() %>